What matters
PN10 and PN16 identify different nominal pressure classes. The matching flange drilling and the valve rating must agree.
What to confirm
Provide design pressure, operating pressure, temperature and the exact pipeline flange standard.
Procurement note
Model designations do not replace an operating-condition review. Final selection must follow the actual project requirements and approved technical documents.
