What matters
A reliable quotation starts with medium, DN, pressure, temperature, connection, materials, actuation and quantity.
What to confirm
Add the flange standard, control requirements, leakage expectation, installation orientation and document needs when available.
Procurement note
Model designations do not replace an operating-condition review. Final selection must follow the actual project requirements and approved technical documents.
